New pool deck
We coordinate with the pool installer and plan the concrete around steps, covers, equipment access, drainage and where people will walk or sit.
Build the deck around a new pool, replace settled concrete, or add space for chairs, dining and easy access around the water. Concrete Indy works directly with homeowners and serves as the concrete crew for pool-company partners that install 200+ pools a year.

We coordinate with the pool installer and plan the concrete around steps, covers, equipment access, drainage and where people will walk or sit.
We remove old concrete around existing pools regularly. A new pour makes sense when several sections have settled, the deck has deteriorated, or the layout and drainage need to change.
Extend a narrow walk, build more space for loungers or add a dining area. We plan the new grade and joints around the old slab and discuss how closely the finishes can match.
When the rest of the deck is sound, replacing a damaged section may be enough. We look for uneven transitions, water movement and loss of support before recommending the scope.
Start with how the deck will feel underfoot, then choose the look. Pitch, drainage, texture and sealer all matter around a wet pool. No outdoor finish is slip-proof.
The most economical new-concrete option in most projects. Fine broom lines give the deck texture and keep the look simple. See how we finish broom-finished patios.
Choose a pronounced stone texture and keep the natural concrete color. It gives you the relief of a stone pattern without the additional cost of custom color.
Use color, antiquing and a contrasting border to play up the pattern. Compare stamp patterns and concrete colors before you choose.
As a planning example, stamped concrete at $20 per square foot works out to $12,000 for 600 square feet at that rate. That’s an example, not a quote. Tear-out, access, drainage, coping and trade work can change the price. If you’re comparing pavers or a composite deck, compare complete quotes with the same prep, transitions and finish rather than the surface price alone.
Once the old deck is out, we can see more of what’s happening underneath. Uneven settling can come from movement in the fill, poor drainage, a leak, or another loss of support. Pouring new concrete without looking for the cause can leave the same problem in place.
We often leave two to three days between demolition and the new pour when other trades need access. Weather, scope, inspection and trade availability can change that window. We schedule the pour after the necessary checks are complete.
Concrete added in different years rarely matches perfectly. When the slabs are stable and compatible, a textured CTi Hallmark overlay can give those sections a more consistent color and finish without tearing out otherwise usable concrete.
Resurfacing can cost less than replacement when the base is sound. It won’t correct heaving, serious settlement, or a drainage failure. We assess the deck first, then explain which option makes sense.
Yes, where the pool and its edge details allow. We evaluate coping, cover tracks, equipment and deck access to plan how to remove and replace the surrounding concrete.
We can coordinate the layout and finish, but new and weathered concrete often look different. If older sections are sound, an overlay may be an option to make them look more uniform.
Broom finish is a practical starting point for a new deck. If you prefer stamped concrete, talk with us about texture and sealer choices for wet areas. Drainage and routine cleaning also matter.
Yes, when it’s needed and included in the scope. We coordinate with pool, plumbing or electrical trades so they can handle applicable checks and repairs before the concrete goes back in.
Surface wear or mismatched color on a stable slab may be a resurfacing candidate. Repeated movement, deep deterioration, or sections that no longer drain correctly may need targeted repairs or replacement.
Send your address and a few photos of the deck, the pool edge and the route into your yard. Tell us whether you’re planning a new pool, replacing the concrete or adding room around it.